Site Engineering and Quality Assurance Program for the Installation of Micro Piles to Stop Settlement of a Tall StructureLas Vegas, Nevada 1998 ![]() In 1998 during the final stages of construction, the 850 million dollar Mandalay Bay Casino in Las Vegas experienced severe settlement problems. These problems were further compounded when it was found the core of the building was settling at a much faster rate then the outer wings thus exhibiting enormous stresses throughout the building. ECO, together with Kleinfelder Inc (U.S.A.), were called to the site in Las Vegas to initiate and perform a Quality Assurance Program that would satisfy both the owner (Circus Circus) and Clark County during the remedial program. ECO’s responsibilities were: 1. Train personnel for Clark County approval. 2. Monitor and record the drilling and installation of 536 Micro Piles (7"o.d. X 200' long) 3. Monitor and record all grouting activities. Test and evaluate the grout samples from every micro pile. 4. Monitor and evaluate the test loading of 536 micro piles. 5. Install long term downhole monitoring equipment. 6. Monitor and oversee the final loading of the micropiles. 7. Perform a crack survey on five different levels of the building before and after load testing. 8. Monitor and oversee the load testing of five different levels of the building. Site design and hosting by PairoWoodies |