New On-site wet Milling Technology for the Preparation of Ultrafine Cement Based Grouts
he use of ultrafine cement-based grout has been gaining importance for rock and soil grouting over the last few years…
he use of ultrafine cement-based grout has been gaining importance for rock and soil grouting over the last few years…
The new Penn Forest Dam was constructed to replace the old earthfilled embankment dam. The new dam is a roller compacted concrete dam located just upstream from the original dam. The new dam is approximately 180 feet high and 2000 feet long.
There are two major components in a soil grouting operation. The first step is the design of a site-specific grouting program.
A pilot grouting program to assess the feasibility of the construction of a tailings dam.
A multiple pass, multiple hole permeation grouting operation directed by ECO was implemented via driven, vertical steel sleeve pipes to encapsulate and contain nuclear waste buried in trenches and prevent the migration of radionuclides.
A soil grouting program was designed and implemented to stabilize the soil and fill voids created by the decaying old timber around 100 year old large sewer tunnel to prevent further settlement to structures located above the tunnel.