Site Engineering and Quality Assurance Program for the installation of Micro Piles to stop settlement of a tall structure, Las Vegas, Nevada, USA
Micro pile program to stop the settlement of a large building in Las Vegas
Micro pile program to stop the settlement of a large building in Las Vegas
Remedial grouting operation to structurally rehabilitate a foundation wall using permeation grouting techniques
Emergency soil grouting program to stabilize the soil below pier D43 at Pearson International Airport
ECO designed and directed a pre-excavation grouting program for a tunnels crossing a major artery in Columbus, Ohio.
Multiple pass multiple phase grouting program to consolidate soil below a busy road artery to facilitate the mining of a tunnel
A pre-excavation grouting program in highly silty soils was designed and directed to facilitate the mining of a series of tunnels below active railway tracks