Minera Alumbrera DCP Grout Curtain Remediation Acrylamide Grouting Program, Catamarca, Argentina Quick turnaround for grout curtain through rock not amenable to regular or microfine based cement grout. Continue Reading →
Ground Stabilization & Compensation Grouting to Install New Sarah Street Sewer Tunnel Below Railway, Mishawaka, Indiana, USA A soil grouting program to treat cohesionless sandy soil to facilitate the installation of a new tunnel below an active railway. Continue Reading →
Site Engineering and Quality Assurance Program for the installation of Micro Piles to stop settlement of a tall structure, Las Vegas, Nevada, USA Micro pile program to stop the settlement of a large building in Las Vegas Continue Reading →
Structural Rehabilitation of a Foundation Wall using Permeation Grouting and Underpinning with Microfine Cement Based Grout, Guelph, Ontario Remedial grouting operation to structurally rehabilitate a foundation wall using permeation grouting techniques Continue Reading →
Pier D43 Stabilization using Microfine Cement and Polyurethane Grouts, Toronto, Ontario Emergency soil grouting program to stabilize the soil below pier D43 at Pearson International Airport Continue Reading →
BWARI – Soil grouting below US23 Crossing (pre-excavation grouting), Columbus, Ohio ECO designed and directed a pre-excavation grouting program for a tunnels crossing a major artery in Columbus, Ohio. Continue Reading →